
Circular C&D
Construction and demolition waste on site
Resolution 0472 of 2017 · amended by Resolution 1257 of 2021Source separation · Resolution 2184 of 2019 · PGIRS
Zero Waste Program by Mano Verde
We design and implement the Integrated Solid Waste Management Plan (PGIRS) for your residential complex, company or institution. We organize disposal points with the color code of Resolution 2184 of 2019, educate users and measure the kilos recovered to work on waste volume assessments and the multi-user rate.
Green assessment in less than 24 hours. The proposal comes after the diagnosis.
How we work
Understand, activate, measure and certify: the same logic as all five methods, with evidence you can show at the end of each step.
Deliverables
Follow-up via WhatsApp and a Mano Verde membership after implementation.
I want Zero Waste in my organizationPhase 9 · Certification
Zero Waste goes through the same 12 phases as the other four methods. In phase 9 the organization earns its seal according to its score. The seal prepares you for external verification; it doesn't replace it.
See the 12-phase roadmapBefore you start
Short answers about Zero Waste. Anything not covered here, we'll answer in the green assessment.
Because sorting is almost never measured. We organize disposal points, measure the kilos recovered month by month and use that data to work on the waste volume assessment and the multi-user rate, which can reduce the cost of waste collection. How much it drops depends on each case, and we see it after the diagnosis.
It is the regulation that unified the color code for source separation in Colombia: white for recyclables, green for compostable organics and black for non-recyclables. The plan that organizes everything else is your organization's PGIRS.
With continuous education: the Green Squad with Nico, Tico, Noa and Peli, signage with QR codes on bins, in waste rooms and elevators, the recycling guide and digital campaigns.
Implementation takes 6 to 12 weeks, depending on scale: 1 to 120, 121 to 300 or more than 300 apartments, or the number of people in companies and institutions.
Related methods
They combine with each other using the same roadmap and the same seal. See all methods

Construction and demolition waste on site
Resolution 0472 of 2017 · amended by Resolution 1257 of 2021


Green Assessment
Tell us about your case in two minutes. In less than 24 hours we'll send you a one-page green assessment with three opportunities, and we'll schedule the call.